New to LNG? Start with the basics
LNG netback and arbitrage calculator
An LNG netback is what a cargo earns at the US Gulf Coast loading port after shipping costs. This calculator compares the netback to Europe (TTF) with three routes to North Asia (JKM), and shows the LNG arbitrage: how far the JKM TTF spread is from paying for the longer voyage. Change any input; your scenario is saved in the page link.
Best destination: Northwest Europe, direct, by $1.09/MMBtu
Arb (best Asia minus Europe): −$1.09/MMBtu. Asia and Europe netbacks are equal at JKM $28.11/MMBtu. JKM would need to rise by $1.11/MMBtu for the arb to flip. TTF converts to $27.38/MMBtu. Cost of supply is $6.31/MMBtu, of which feedgas $3.57/MMBtu.
| Route | Laden voyage (days) | Shipping ($/MMBtu) | Boil-off ($/MMBtu) | FOB netback ($/MMBtu) | Full-cost margin ($/MMBtu) | Lift/cancel margin ($/MMBtu) |
|---|---|---|---|---|---|---|
| NW Europe (TTF), directNWE direct | 13.0 | 0.29 | 0.31 | 26.78 | 20.47 | 23.22 |
| North Asia (JKM) via PanamaAsia via Panama | 22.6 | 0.78 | 0.53 | 25.69 | 19.38 | 22.13 |
| North Asia (JKM) via SuezAsia via Suez | 35.6 | 0.92 | 0.84 | 25.24 | 18.92 | 21.67 |
| North Asia (JKM) via Cape of Good HopeAsia via Cape | 38.5 | 0.75 | 0.91 | 25.34 | 19.03 | 21.78 |
Lift/cancel margin leaves out the liquefaction fee, which is owed whether or not the cargo is lifted, so it shows whether lifting beats cancelling.
Source: calculation from the inputs above. Henry Hub: EIA. EUR/USD: ECB.
The arb does not change sign between $0 and $150,000/day.
Source: calculation from the inputs above. Henry Hub: EIA. EUR/USD: ECB.
Inputs
How this is calculated
All prices in $/MMBtu. Formulas run in a tested module (site/src/lib/netback.ts).
- TTF in $/MMBtu = TTF (€/MWh) × EUR/USD ÷ 3.412
- Laden days = distance (nm) ÷ (speed (knots) × 24). Round trip = 2 × laden days. The ship returns in ballast over the same distance.
- Loaded MMBtu = vessel size (m³) × conversion factor (MMBtu/m³)
- Delivered MMBtu = loaded MMBtu × (1 − boil-off rate × laden days)
- Shipping cost = (charter rate × round-trip days + canal fee × 2 + port costs) ÷ delivered MMBtu
- Boil-off cost = loaded MMBtu × boil-off rate × laden days × destination price ÷ delivered MMBtu
- FOB netback = destination price − shipping cost − boil-off cost
- Cost of supply = feedgas multiplier × Henry Hub + liquefaction fee
- Full-cost margin = FOB netback − cost of supply
- Lift/cancel margin = FOB netback − feedgas multiplier × Henry Hub. Lift/cancel margin leaves out the liquefaction fee, which is owed whether or not the cargo is lifted, so it shows whether lifting beats cancelling.
- Arb = best Asia netback − Europe netback
- Breakeven JKM: each Asia netback is linear in JKM, so the breakeven is solved exactly. It is the lowest JKM at which any Asia route matches the Europe netback.
- Breakeven charter rate: the charter rate at which the arb is zero, found numerically.
Simplifications
- One charter rate for all routes. In practice Pacific and Atlantic rates differ.
- Boil-off applies to the laden leg only. Heel and fuel use on the ballast leg are not modelled.
- The full vessel capacity is loaded. The fill limit (about 98.5%) and heel are ignored.
- Tokyo Bay is the North Asia reference port. Canal fees average the laden and ballast tolls.
- Canal waiting times, congestion and Red Sea security costs are not included.
Default assumptions and sources
Verified on 21 Nov 2026. Henry Hub and EUR/USD refresh daily. Full notes in assumptions_sources.md.
| Input | Default | Unit | As of | Source |
|---|---|---|---|---|
| Henry Hub spot | 3.1 | $/MMBtu | 17 Nov 2026 | EIA, Henry Hub Natural Gas Spot Price (RNGWHHD) |
| TTF front-month | 85 | EUR/MWh | 20 Nov 2026 | Manual. Indicative round level from public press reports of the Dec-26 contract (EUR 85 to 86/MWh). Not a licensed assessment. |
| North Asia spot LNG (JKM proxy) | 27 | $/MMBtu | 20 Nov 2026 | Manual. Indicative round level from public press reports of the weekly North-east Asia spot LNG average for January delivery ($26.90/MMBtu). Not a licensed assessment. |
| EUR/USD | 1.099 | USD per EUR | 20 Nov 2026 | ECB euro foreign exchange reference rate |
| Charter rate (174k m3, two-stroke, Atlantic spot) | 35,000 | $/day | 18 Nov 2026 | Public weekly shipping commentary: Atlantic two-stroke $38,400/day (week 45) and $33,200/day (week 46), 2026 |
| Vessel cargo capacity | 174,000 | m3 | 21 Nov 2026 | Industry standard newbuild size (IIR, 'The future standard for energy-saving LNG carriers') |
| Conversion factor | 23.4 | MMBtu per m3 LNG | 21 Nov 2026 | 0.45 t/m3 LNG density x 52 MMBtu/t (common industry factors). Gasgrid Finland conversion table gives 24.02 (+2.6%). |
| Boil-off rate (laden) | 0.085 | % per day | 21 Nov 2026 | Modern membrane carrier benchmark 0.085%/day (Gas Carrier Update 2015, Univ. Hamburg); Argus cites 0.08%/day for a typical two-stroke carrier |
| Vessel speed | 17 | knots | 21 Nov 2026 | Implied by Kpler voyage times (via MET Group, 2023): 22 days via Panama, 35 via Suez, 38 via Cape, which equal 17.2 to 17.4 knots on the distances below |
| Panama Canal fee | 640,000 | $ per transit | 21 Nov 2026 | Panama Canal Authority tolls page: Neopanamax LNG fixed $300,000/transit + $2.05/m3 capacity, ballast 85% of tolls, mandatory Neopanamax tug $30,000. Average of laden and ballast for 174,000 m3. |
| Suez Canal fee | 450,000 | $ per transit | 21 Nov 2026 | Nominal LNG carrier toll about $397,000 (Argus table, undated) plus SCA temporary surcharge for LNG carriers raised to 19% from 15 July 2026. Rebates for US Gulf to Asia vary. Low confidence. |
| Port and other costs | 250,000 | $ per voyage | 21 Nov 2026 | US Gulf load port under $70,000/call (Wood Mackenzie via Riviera, 2025) plus discharge port about $150,000 to $250,000 (Platts port-cost notes, 2024), plus agency and sundries |
| Liquefaction fee | 2.75 | $/MMBtu | 21 Nov 2026 | Cheniere Q4 2025 call: pricing above midpoint of $2.50 to $3.00 range (via S&P Global, 2026); Argus Dec 2025 indicative benchmark $3.00 |
| Feedgas multiplier | 115 | % of Henry Hub | 21 Nov 2026 | Cheniere Sabine Pass SPAs: 115% of Henry Hub plus fixed fee (SEC filings) |
| Distance: NWE direct | 5,300 | nm | 21 Nov 2026 | Sabine Pass to Gravelines 5,152 nm (Sealagom) plus about 150 nm to Rotterdam; ports.com gives 5,657 nm |
| Distance: Asia via Panama | 9,209 | nm | 21 Nov 2026 | Sabine Pass to Tokyo via Panama, 9,209 nm (Riviera Maritime Media); S&P Global gives 9,214 nm |
| Distance: Asia via Suez | 14,521 | nm | 21 Nov 2026 | Sabine Pass to Tokyo via Suez, 14,521 nm (Riviera, citing sea-distances.org); S&P Global gives about 14,500 |
| Distance: Asia via Cape | 15,689 | nm | 21 Nov 2026 | Sabine Pass to Tokyo via Cape of Good Hope, 15,689 nm (S&P Global, 2016) |
TTF and JKM defaults are entered by hand from public press reports and are indicative only. No licensed price assessments are used. Enter your own levels.